Project Manager (PMAN) Test phase, srs, design phase and code final deliverable

Get help with
Phd, Masters Thesis & Mcs Final Project
MBA Final Project
Cs619,Fin619,Mgt619,Bnk619,Hrm619,Mkt619
WhatsApp: 0092-3125718857
Skype: trust_aware
Email: projecthelp77@gmail.com
Click here to Join Our Facebook Page
Click here to Join Our YouTube Channel!

Project Manager (PMAN) Test phase, srs, design phase and code final deliverable

Get paid solution for this project including srs document,design document,test phase document,
final report software,presentation and final code. Mail on projecthelp77@gmail.com

Project Domain / Category
Web Programming

Abstract / Introduction
Different software program improvement groups comply with one-of-a-kind software development fashions e.G. Waterfall, RAD, spiral and Iterative and so on. PMAN is an online utility as a way to manage all of the tasks undertaken through a sure software program development corporation. A assignment may be advanced via using any suitable system version for example an ERP can be evolved via Waterfall model on the equal time when the same organization is developing some other POS terminal system by way of the use of Spiral Model. PMAN will facilitate business enterprise via letting it manage mission associated sports e.G. Which resources are allotted to which initiatives? What are cut-off dates of certain project? How a great deal of a sure assignment is finished, Are we on finances and agenda? Which aid character has how a good deal load? Etc.


Functional necessities:

Project Assignment Module (PAM):
This is the only module of application, operated with the aid of pinnacle-stage control to assign a sure development version to a task at the side of final cut-off date and finances. Alternatively this module can also be used to test complete agenda of a mission along side records of the projects which might be running out of schedule.

Work Breakdown Module (WBM):
This module will let us spoil a certain task in range of sub sports (as much as N level) and assign sure useful resource character(s) to each hobby along with their cut-off dates. This module also can be used to music man or woman assets along side their assigned obligations, closing dates, load degree [1] Etc. This module may be used for useful resource reassignment to other sports as properly.

Budget Management Module (BMM):
This module may be used to control normal finances of the challenge. All the costs which can be completed with passage of time are entered at the side of their details. The reports generated by this module can be used to test data like: How lots budget has been consumed? How a lot price range is left? Are we jogging out of price range or no longer? And many others.

Project Complete Picture (PCP):
This module will display the complete image of projects i.E. All of the information of the mission but facts can be proven according to the user stage e.G. Pinnacle management can take a look at entire statistics such as price range, lower-level management can see most effective paintings breakdown and so on.

[1]Note: You can use any method to evaluate paintings load of a resource.

Tools: ASP.Net, C#, SQL Server.

Supervisor
Name: Muhammad Summair Raza

Leave a Reply

Your email address will not be published. Required fields are marked *

× WhatsApp Us